Project Case Study — Air Cooled Condenser Components for Thailand Waste-to-Energy Power Plant


Project Overview

      This project is a waste-to-energy (WTE) incineration power plant in Thailand, featuring two power generation units of 9.9MW and 11MW respectively, with air cooled condenser (ACC) systems arranged on concrete platforms. Qingdao Ruichen Power & Environmental Protection Equipment Co., Ltd. supplied the core heat exchange equipment for the air cooling system, with the scope of supply covering air cooled condenser tube bundles and related components.



Project Highlights

  • The ACC island adopts a concrete platform layout, offering a stable structure and compact footprint that suits on-site installation requirements while minimizing water consumption — a key advantage for waste incineration power plant sites;

  • As the core heat exchange component of the air cooled condenser, the tube bundles were engineered and manufactured by Ruichen to meet project-specific technical requirements, ensuring high thermal efficiency and long-term operational reliability;

  • Full-process support from drawing coordination and manufacturing to delivery, guaranteeing smooth and timely project execution.

Project Significance This project stands as a representative reference in Southeast Asia's waste-to-energy sector, validating Ruichen's adaptability and delivery capability of air cooling products for overseas waste incineration power plants, and reinforcing our experience in expanding into the international environmental power market.