Meta Description
Ruichen supplied air cooled condenser tube bundles for a Thailand waste-to-energy power plant with 9.9MW & 11MW units on concrete platforms. Reliable ACC components for waste incineration projects worldwide.
Project Case Study — Air Cooled Condenser Components for Thailand Waste-to-Energy Power Plant
Project Overview
This project is a waste-to-energy (WTE) incineration power plant in Thailand, featuring two power generation units of 9.9MW and 11MW respectively, with air cooled condenser (ACC) systems arranged on concrete platforms. Qingdao Ruichen Power & Environmental Protection Equipment Co., Ltd. supplied the core heat exchange equipment for the air cooling system, with the scope of supply covering air cooled condenser tube bundles and related components.
![]()
![]()
Project Highlights
The ACC island adopts a concrete platform layout, offering a stable structure and compact footprint that suits on-site installation requirements while minimizing water consumption — a key advantage for waste incineration power plant sites;
As the core heat exchange component of the air cooled condenser, the tube bundles were engineered and manufactured by Ruichen to meet project-specific technical requirements, ensuring high thermal efficiency and long-term operational reliability;
Full-process support from drawing coordination and manufacturing to delivery, guaranteeing smooth and timely project execution.
Project Significance This project stands as a representative reference in Southeast Asia's waste-to-energy sector, validating Ruichen's adaptability and delivery capability of air cooling products for overseas waste incineration power plants, and reinforcing our experience in expanding into the international environmental power market.
![]()